Shockbyte - Notice history

All systems operational

Website (shockbyte.com) - Operational

100% - uptime
Jan 2025 · 100.00%Feb · 100.00%Mar · 100.00%
Jan 2025
Feb 2025
Mar 2025

Billing System (shockbyte.com/billing) - Operational

100% - uptime
Jan 2025 · 100.00%Feb · 100.00%Mar · 100.00%
Jan 2025
Feb 2025
Mar 2025

Control Panel (panel.shockbyte.com) - Operational

100% - uptime
Jan 2025 · 100.00%Feb · 100.00%Mar · 99.960%
Jan 2025
Feb 2025
Mar 2025

Notice history

Mar 2025

[Game Servers, EU] Upgrades to New Hardware
Scheduled for March 31, 2025 at 11:00 PM – April 01, 2025 at 6:00 AM about 7 hours
  • Planned
    March 31, 2025 at 11:00 PM
    Planned
    March 31, 2025 at 11:00 PM

    We occasionally perform hardware upgrades to ensure we are always providing the best and latest hardware for our customers. In December 2024, we sent out emails to eligible customers about early access to upgrading to our new hardware, powered by AMD EPYC 4464P CPUs @ 5.4 GHz (equivalent to the AMD Ryzen 9 7900X).

    Within this maintenance window, we will upgrade eligible servers in our European locations to the new hardware. We expect a downtime of between 15-60 minutes during the switchover period, however, the actual length may vary (it could be shorter or longer based on the size of your server). Please note that your Server IP will change.

    We have blocked out 7 hours for this as we slowly upgrade servers, however, we do not expect servers to be affected for the entire period. The upgrade will be performed as a rolling upgrade, which means affected servers will be upgraded at some point during the maintenance period - not necessarily at the beginning. Rest assured that we are making every effort to minimise the impact on customers.

    If you would like to upgrade earlier, you can do so by visiting your server's control panel and clicking "Transfer Now" on the upgrade alert:

    https://i.rebooti.ng/f/CjcgqizX1q.png

    (If you do not see this box, your server is not yet eligible. Rest assured, your server will be made eligible as soon as possible.)

Feb 2025

Jan 2025

[Game Servers, EU] Upgrades to New Hardware
  • Completed
    January 30, 2025 at 9:14 AM
    Completed
    January 30, 2025 at 9:14 AM

    We will no longer be upgrading any servers to the new hardware. If you would like to pursue the free upgrade, if your server is eligible, you should see a banner in your control panel as shown in an earlier post on this status page.

    Thank you all for your patience.

  • In progress
    January 17, 2025 at 5:17 AM
    In progress
    January 17, 2025 at 5:17 AM
    Maintenance is now in progress.
  • Planned
    January 16, 2025 at 9:00 AM
    Planned
    January 16, 2025 at 9:00 AM

    We occasionally perform hardware upgrades to ensure we are always providing the best and latest hardware for our customers. In December 2024, we sent out emails to eligible customers about early access to upgrading to our new hardware, powered by AMD EPYC 4464P CPUs @ 5.4 GHz (equivalent to the AMD Ryzen 9 7900X).

    Within this maintenance window, we will upgrade eligible servers in our European locations to the new hardware. We expect a downtime of between 15-60 minutes during the switchover period, however, the actual length may vary (it could be shorter or longer based on the size of your server). Please note that your Server IP will change.

    We have blocked out 2 weeks for this as we slowly upgrade servers, however, we do not expect servers to be affected for the entire period. The upgrade will be performed as a rolling upgrade, which means affected servers will be upgraded at some point during the maintenance period - not necessarily at the beginning. Rest assured that we are making every effort to minimise the impact on customers.

    If you would like to upgrade earlier, you can do so by visiting your server's control panel and clicking "Transfer Now" on the upgrade alert:

    https://i.rebooti.ng/f/CjcgqizX1q.png

    (If you do not see this box, your server is not yet eligible. Rest assured, your server will be made eligible as soon as possible.)

Jan 2025 to Mar 2025

Next